Expo 2030 and the 2034 FIFA World Cup are the two dates on Saudi Arabia's calendar that every property brochure mentions. They matter, but not in the way brochures suggest. Each event brings permanent infrastructure, some permanent homes and a short, intense burst of visitors. Neither, on its own, sets the long-term price of a home. The evidence from Qatar, which held the World Cup in 2022, is that rents and sales fell back once the tournament had gone and the new supply remained.
This guide sets out what each event brings to Riyadh and Jeddah, when, and where, and how a buyer should read it, as of November 2026.
Expo 2030 Riyadh: dates, site and plans
| Fact | Detail | Source |
|---|---|---|
| Dates | 1 October 2030 to 31 March 2031, six months | Expo 2030 Riyadh |
| Theme | Foresight for Tomorrow | Expo 2030 Riyadh |
| Site | More than 6 million m² in north Riyadh, about 2 million m² inside the gates and 4 million m² of logistics and services | Expo 2030 Riyadh, via Arab News |
| Participants | 197 countries expected | Expo 2030 Riyadh |
| Visitors | About 42 million visits expected | Expo 2030 Riyadh |
| Budget | US$ 7.8 billion allocated by the government | Gulf Construction Online |
| Legacy | At least 95% of the structures built by the Expo company to be reused as a Global Village | Expo 2030 Riyadh, via Arab News |
The site lies in north Riyadh near King Khalid International Airport and the planned King Salman International Airport, whose masterplan covers about 57 square kilometres with six runways. A dedicated metro station will connect the Expo to the airport and the rest of the network, and King Salman Road is being widened to improve access to the airport.
Expo 2030 construction progress
Work moved from preparation to full construction during 2025. In late December 2025 Nesma & Partners won the main utilities and infrastructure package, covering about 50 km of utility networks, internal roads and civil works, and Bechtel and Buro Happold have been mobilised. By May 2026 about 6.2 million m³ of earthworks were complete and 77% of the development areas had been handed over for the next stages. Infrastructure, buildings and public spaces are scheduled to advance through 2026 and into early 2027.
In September 2026 the Expo company signed a SAR 3.2 billion joint venture with Mohammad Al Habib Real Estate to build the Expo Village: about 2,300 apartments for some 5,500 people, with shops, restaurants and services. It will house official delegations during the Expo and become a permanent residential community afterwards, with further residential projects expected in the legacy phase. A hotel near the site is also under development.
What Expo 2030 means for Riyadh property
What lasts. The Expo leaves north Riyadh with a metro station, wider roads, a hotel, a residential village and a planned Global Village of offices, homes, education, culture and retail on the site. That is a permanent new district on the airport side of the city, and it adds to the case for the established communities nearby: Sedra, Khuzam and Al Narjis, each about 15 minutes from King Khalid International Airport.
What passes. Six months of visitors fill hotels and short-stay homes, then leave. The organisers project a US$ 67 billion contribution to GDP; that is a projection, and it is spread across the economy rather than paid into rents.
What it adds to supply. The Expo Village becomes 2,300 apartments after the event, and the Global Village will add more. Homes near the site will compete with them from 2031.
The rent freeze. Riyadh's five-year freeze on residential and commercial rents runs from 25 September 2025, so its five years end in September 2030, days before the Expo opens. Whether it will be extended has not been announced. Model a buy-to-let in Riyadh on today's rent, not on an Expo year.
FIFA World Cup 2034 in Saudi Arabia: dates and venues
FIFA confirmed Saudi Arabia as host of the 2034 World Cup by acclamation at its Extraordinary Congress on 11 December 2024. It will be the first 48-team World Cup held in one country. FIFA's evaluation scored the bid 419.8 out of 500.
| Measure | Plan in the bid | Source |
|---|---|---|
| Stadiums | 15, against FIFA's minimum of 14 | FIFA evaluation, via Saudipedia |
| Host cities | Five; eight stadiums in Riyadh, four in Jeddah | Saudipedia |
| Hotel rooms | About 230,000, of which 127,000 in Riyadh and 43,000 in Jeddah | Saudipedia |
| Training facilities | 134 | FIFA evaluation |
| Transport | The Riyadh Metro links all of Riyadh's stadiums | FIFA evaluation |
Riyadh's main venues. The planned King Salman International Stadium in north Riyadh is designed for up to 92,000 spectators and due in 2029. King Fahd Sports City Stadium (70,000) and King Saud University Stadium (46,000) are existing grounds to be renovated or enlarged. New stadiums are planned at ROSHN in the south-west (up to 45,000), in south Riyadh (47,000), in New Murabba (more than 45,000) and at Qiddiya (46,000).
Jeddah's main venues. A new 45,000-seat stadium in Jeddah Central and the existing King Abdullah Sports City, with 58,000 seats and a renovation planned, lead the Jeddah list.
The dates. FIFA confirmed the host without a timetable. Its evaluation said the local climate favours a tournament between October and April, and Ramadan falls from about 11 November to 10 December 2034, so the usual November to December window used by Qatar is not available. Until FIFA announces dates, treat any World Cup timing in a sales pitch as unconfirmed.
What the World Cup means for Riyadh and Jeddah property
Riyadh. The stadium programme adds to the city's transport and sports infrastructure, much of it already built. One planned venue is in New Murabba, where Reuters reported in January 2026 that work on the Mukaab had been suspended and that the district is now slated for 2040. A stadium on a plan is not yet a neighbourhood.
Jeddah. The World Cup ties into Jeddah Central, the state's 5.7 million m² waterfront district with about 17,000 homes, an opera house, a museum, a stadium and an oceanarium, whose first phase was planned for the end of 2027. Jeddah Central is a designated zone, and the One&Only and Atlantis residences are planned there. North of the city, Al Falah sits beside King Abdullah Sports City, with new apartments at Khayala. Jeddah Tower, past 430 metres in August 2026, is due in 2028.
A World Cup lasts weeks, not years. Its lasting effect on a Jeddah or Riyadh home comes from what is finished around it.
Hotels and short-stay demand during the events
Both events need beds. The World Cup bid counts about 230,000 hotel rooms across the host cities, 127,000 of them in Riyadh and 43,000 in Jeddah, and the Expo expects about 42 million visits over six months. Tourism is already large: the Ministry of Tourism's preliminary count for 2025 was about 122 million visits, with spending of about SAR 300 billion, against a 2030 target of 150 million visits a year.
For a home owner this creates a window, not a business plan. A licensed furnished home near the Expo site, a metro station or a stadium can let by the night at higher rates while the events run. Outside them it competes with the hotels built for the events. The sound test is whether the home earns an acceptable yield on long lets in a normal year. If it does, event income improves the numbers; if it does not, a few event months will not rescue it.
The building matters as much as the location. A building's rules can forbid nightly lets, and branded residences run by a hotel operator may have their own rental programme with its own terms. Ask before you buy, and read rental programmes and returns.
How to read Expo 2030 and the World Cup as a buyer
Qatar is the nearest test. Knight Frank's review of Qatar's market in 2023 found residential sales down 36% over twelve months and their value down 24%; quoted apartment rents fell 23% in a quarter in Lusail's Waterfront district and 18% in Fox Hills. Knight Frank put it down to an imbalance between supply and demand, higher interest rates and affordability. Riyadh and Jeddah are larger and more varied economies than Qatar's, but the lesson about supply built ahead of an event holds.
Do:
- Buy for what stays: metro lines, roads, the airport, parks, Jeddah Central and the Expo legacy district.
- Check that the infrastructure near the home is funded and under construction, not only announced.
- Price on today's rent and today's registered sales.
- Keep event income separate in your numbers: a licensed short let during the Expo is a bonus, not the yield.
Do not:
- Pay a premium because a brochure names 2030 or 2034.
- Buy off-plan due just before an event and count on event demand to sell it.
- Assume the event districts will be finished on time; check progress.
Letting by the night needs a private hospitality unit licence from the Ministry of Tourism; read short-term rentals in Saudi Arabia. Off-plan buyers should also read buying off-plan: a Wafi licence and an escrow account protect stage payments, but they do not move a handover date to suit an event. Then test a normal year's numbers:
The property
The letting
The running costs
Net yield
3.9%
After costs and tax, on the price plus buying costs.
Gross yield
4.6%
Rent before costs, on the price alone.
Net rent a year
SAR 82,800
What the rent leaves after every line below.
- Gross rent a yearSAR 100,000 a year at 92% occupancy
- SAR 92,000
- Management5% of gross rent
- −SAR 4,600
- Service chargeSAR 0 per sqm a year on 120 sqm
- SAR 0
- Running costs5% of gross rent
- −SAR 4,600
- Tax0% of rent after costs
- SAR 0
- Net rent a year
- SAR 82,800
Payback
Net rent repays the outlay in about 25 years, at these figures.
Estimates from your own inputs, not a forecast or a promise of income. In Riyadh's urban area rents are frozen for five years from 25 September 2025 at the level then in force, so do not assume increases. Leases must be registered on Ejar. See Ejar.
Sources for these figures
- PwC Worldwide Tax Summaries, Saudi Arabia, individual: taxes on personal income, last reviewed 29 July 2026
- ZATCA, General Guideline for Withholding Tax, second version, May 2026 (rent 5%)
- King & Spalding, Saudi Arabia introduces rent controls and automatic lease renewal, 29 September 2025
- Law of Ownership, Subdivision and Management of Real Estate Units, Royal Decree M/85, Articles 12 and 26 (REGA)
- ZATCA, Detailed Guideline for Real Estate Transaction Tax, version 6, May 2026
Send me this breakdown
Your yield, line by line, by email. An adviser will check it against the rents and fees of a real development.
Email me the breakdown
Timeline: Riyadh and Jeddah to 2035
| Date | Milestone |
|---|---|
| January 2025 | Riyadh Metro complete: six lines, 176 km, 85 stations |
| December 2025 | Six Flags Qiddiya City opens; main Expo infrastructure contract awarded |
| 2026 to early 2027 | Expo infrastructure, buildings and public spaces under construction |
| End of 2027 | Jeddah Central first phase, as planned in 2021 |
| 2028 | Jeddah Tower due |
| 2029 | King Salman International Stadium due |
| September 2030 | Five years of the Riyadh rent freeze end |
| 1 October 2030 to 31 March 2031 | Expo 2030 Riyadh |
| From 2031 | Expo Village and Global Village reused as permanent districts |
| 2034, dates to be set | FIFA World Cup |
| 2040 | New Murabba's revised target |
Dates are as announced by the bodies responsible and can move.
Where to buy with the events in mind
The events point to the same places that already have the strongest everyday case: north Riyadh around the metro and the airport, and Jeddah's central and northern waterfront.
- North Riyadh, airport and Expo side: Sedra, a designated zone, and Khuzam and Al Narjis for residents.
- North Riyadh, jobs and the metro: KAFD, Al Malqa and Hittin.
- Jeddah: Jeddah Central, Al Shati on the Corniche and Al Falah near the stadium.
Browse property for sale in Riyadh and property for sale in Jeddah, read Riyadh's growth and property for every project and the districts it touches, and Vision 2030 for buyers for the national plan behind both events. The full case for buying is in why invest in Saudi Arabia. Property values and rents can fall as well as rise.



